A major New Malden road will be shut down for two weeks by Transport for London roadworks.
Malden Road will be closed to traffic from 8pm to 5am from today until at least the middle of the month.
The stretch between Idmiston Road and Blakes Lane will be resurfaced as part of the London Highways Alliance Contract.
Access to homeowners will be possible through traffic control measures put in place by contractors.
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules here